Murrumba Downs QLD 4503 ยท Moreton Bay
EV Charger Installation Murrumba Downs
Connex Electrical, a licensed electrical contractor (#92217) based in Mango Hill, installs EV chargers in Murrumba Downs. Standard home installs are from $990 installed (inc GST), take about 2 to 4 hours and come with a fixed written quote. Murrumba Downs is a settled family suburb right beside Mango Hill, with homes mostly from the 1990s and 2000s and plenty of double garages ready for a wallbox.
- Licensed electrical contractor #92217
- $20M public liability
- Local team based in Mango Hill
- Fixed written quotes
- Read our Google reviews
Wallbox installs for Murrumba Downs families
Homes in Murrumba Downs are mostly lowset brick and rendered houses built through the 1990s and 2000s. The double garage usually sits at the front, and the meter box is on the side or front wall, so the run is short and the charger ends up within reach of either car. Homes of this age generally have RCD protection and a switchboard with room to spare.
Where we find limits, it is often because the house has grown. A pool added in 2010, a second air conditioner, a granny flat or a home office can each draw from the same supply. We total up what is connected and, if needed, fit a charger with load management so it backs off during peaks instead of tripping the main switch.
A single-phase 7kW wallbox fits most driveways here. If the household has two EVs, a single charger used on alternate nights is often enough, given how short most local trips are.
Murrumba Downs notes
Murrumba Downs has its own station on the Redcliffe Peninsula line and quick access to the Bruce Highway, so commuting by train or car are both easy. The Pine River runs along one side of the suburb.
Solar uptake is high across homes of this age, and many original systems are now ten or more years old. If you are planning to replace or expand panels, think about doing it alongside the charger so the inverter and charger can be matched for solar charging. We can point you in the right direction, and our EV charger brands page lists which units support solar matching.
Murrumba Downs is part of Energex's network, and the rules for home chargers changed in October 2026. We check what your connection needs.
What an EV charger install costs in Murrumba Downs
A standard single-phase EV charger installation in Murrumba Downs costs from $990 inc GST with Connex Electrical, plus the charger if you need one. Most Murrumba Downs houses pay just that. The price only rises for a long cable run, an older switchboard that needs upgrading, or a three-phase charger, and you see any extra in a fixed written quote first.
| Situation | Price |
|---|---|
| Garage or carport close to a modern switchboard | From $990 installed (inc GST) |
| Charger on the far side of the house, or a detached garage | Standard price plus the extra cable, quoted from photos |
| Older board with fuses or no safety switches | Standard price plus a switchboard upgrade, quoted separately |
| Three-phase home with an 11kW or 22kW charger | Quoted per job |
Included as standard: a new charger circuit and protection at your switchboard, cabling within the standard allowance, mounting, app setup, testing and a compliance certificate. The charger itself is extra unless you already own one.
How to pay less for a charger in Murrumba Downs
- Already have a charger from the dealer? We install it, so you only pay for installation.
- Mount the charger on the garage wall closest to the meter box. A shorter run is the easiest saving.
- Choose a 7kW single-phase charger. It suits almost every household and avoids three-phase costs.
- If a second EV is coming, size the cable for it now rather than paying for a second callout later.
Murrumba Downs is about 5 minutes from our Mango Hill base, so travel is minimal and we can often arrange a visit within a couple of days.
Every Murrumba Downs job gets a fixed written price before any work starts, so the quote is what you pay. For a line-by-line breakdown, see the EV charger installation cost guide for Brisbane, or call 0474 207 609.
How it works
- Step 1
Quote
Send photos of your switchboard and charger spot, or call. We reply with a fixed written price.
- Step 2
Site check
If anything is unusual, such as a long run or an older board, we check it in person first.
- Step 3
Install
Most standard installs take 2 to 4 hours on the day.
- Step 4
Test and certify
We test, commission the charger with your car and issue your Certificate of Testing and Compliance.
Suburbs close to Murrumba Downs
See every suburb in Moreton Bay, or read about home EV charger installation, commercial and body corporate charging and the cost of installation in Brisbane.
Common questions in Murrumba Downs
We added a pool and granny flat to our Murrumba Downs home. Is there still room for a charger?
Possibly, but it needs checking. Each addition draws from the same supply, and evening peaks can add up quickly. We assess what is connected and your supply rating. If headroom is tight, a charger with load management can slow down when other loads are running, which usually avoids an expensive supply upgrade while still charging the car fully overnight.
What does it cost to install an EV charger in Murrumba Downs?
A standard single-phase install in Murrumba Downs is from $990 inc GST with Connex Electrical, plus the charger unless you already have one. Long cable runs, switchboard upgrades and three-phase chargers cost extra and are quoted in writing first. Most installs take 2 to 4 hours.
What is the most affordable way to install an EV charger in Murrumba Downs?
Put the charger close to the switchboard, choose a 7kW single-phase unit and send photos so we can quote without a visit. If you already have a charger, you only pay for installation, at the standard $990 inc GST. Every quote is fixed, so there are no surprises on the day.
Do I need Energex approval to install an EV charger?
Energex rules for home EV chargers changed in October 2026, and we check the current requirements for your connection and lodge any notification Energex needs. For a typical single-phase home charger you do not need to apply for anything yourself. Three-phase chargers and multi-charger sites can need more checks against your connection, and we work through those before installation day.
Can I charge two EVs at home?
Yes. You can fit two chargers that share the available power, or one charger and plan charging times. Many chargers support load sharing, so both cars charge overnight without overloading your supply. If you expect a second EV soon, mention it at quoting so we size the circuit and cable for it now and save a second callout later.
How long does it take to install a home EV charger?
Most standard home installs take 2 to 4 hours on the day. That covers mounting the charger, running the cable, fitting a dedicated circuit and protection, then testing and commissioning with your car. Allow most of a day if a switchboard upgrade is done at the same visit. Booking lead time depends on the season, so call for the next available slot.
Book your Murrumba Downs EV charger install
Send a few details and photos of your switchboard and charger spot. Most homes can be quoted without a visit.
Call 0474 207 609Connex Electrical, QLD Electrical Contractor Licence #92217. $20M public liability. Based in Mango Hill, servicing Brisbane and Moreton Bay.